INSTALLATION MANUALFOR INSTALLERCONTENTS1. BEFORE INSTALLATION ...22. OUT
21. BEFORE INSTALLATION1-1. THE FOLLOWING SHOULD ALWAYS BE OBSERVED FOR SAFETY• Be sure to read “THE FOLLOWING SHOULD ALWAYS BE OBSERVED FOR SAFETY”
32. Front (blowing) side openAs long as space like the one showninthegurecanbemaintained, it does not mat-ter if there are obstacles in three d
41-6. INSTALLATION DIAGRAMUnitsshouldbeinstalledbylicensedcontractoraccordingtolocalcoderequirements.Aftertheleaktest,applyinsulat-ing
52. OUTDOOR UNIT INSTALLATION2-1. CONNECTING WIRES FOR OUTDOOR UNIT• Be sure to use special circuits for room air conditioner.• Wiring work should
63. FLARING WORK AND PIPE CONNECTION3-1. FLARING WORKPipe diameter [mm(inch)]Nut (mm)A[mm(inch)] Tightening torqueClutchtypetool for R410AClut
74-1.PURGINGPROCEDURESANDLEAKTESTStop valve for GASStop valve cap(Torque 19.6 to 29.4 N•m, 200 to 300 kgf•cm, 15 to22 ft•lb)Gauge manifold valve
84-3.TESTRUN• Besuretoperformthetestrunforeachunit.Makesureeachindoorunitoperatesproperlyfollowingtheinstallationmanualattache
HEAD OFFICE: TOKYO BLDG., 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPANJG79A039H01JG79A039H01_cover4.indd 2 5/9/2008 2:23:16 PM
Comments to this Manuals