3-2. PIPE CONNECTION
• Fastenarenutwithatorquewrenchasspeciedinthetable.
• When fastenedtootight, arenutmay brakeaftera longperiodand
cause refrigerant leakage.
Outdoor unit connection
Connect pipes to stop valve pipe joint of the outdoor unit in the same
manner applied for indoor unit.
For tightening, use a torque wrench or spanner and use the same
tightening torque applied for indoor unit.
3-3. INSULATION AND TAPING
1) Cover piping joints with pipe cover.
2)Foroutdoorunitside,surelyinsulateeverypipingincludingvalves.
3)Usingpiping tape(E),apply tapingstartingfrom theentryof outdoor
unit.
Stop the end of piping tape (E) with tape (with adhesive agent at
-
tached).
When piping have to be arranged through above ceiling, closet or
wherethetemperatureandhumidityarehigh,windadditionalcom
-
merciallysoldinsulationtopreventcondensation.
4-1. PURGING PROCEDURES AND LEAK TEST
Stop valve
for GAS
Stop valve cap
(Torque19.6to
29.4N•m,200
to 300 kgf•cm)
Gauge manifold
valve (for R410A)
Compound pressure
gauge (for R410A)
–0.101MPa
(–760 mmHg)
Handle
Low
Handle High
Vacuum pump
(for R410A)
*Close
*Open
Hexagonal wrench
*4to5turns
Stop valve
for LIQUID
4. PURGING PROCEDURES, LEAK TEST, AND TEST RUN
Pressure gauge
(for R410A)
Precautions when using
the control valve
When attaching the control valve to
theserviceport,valvecoremayde-
form or loosen if excess pressure is
applied.Thismaycausegasleak.
Service port
Charge hose
(for R410A)
Body
Close
Open
Control
valve
A
When attaching the control valve to
the service port, make sure that the
valve core is in closed position, and
then tighten part A. Do not tighten
partAorturn the bodywhenvalve
core is in open position.
4-2. GAS CHARGE
Perform gas charge to unit.
1)Connectgascylindertotheserviceportofstopvalve.
2) Perform air purge of the pipe (or hose) coming from refrigerant gas
cylinder.
3)Replenishspecied amountof therefrigerant,while operatingthe air
conditioner for cooling.
Note:
Incaseofaddingrefrigerant,complywiththequantityspeciedforthe
refrigeratingcycle.
CAUTION:
Whenchargingtherefrigerantsystemwithadditionalrefrigerant,besure
touseliquidrefrigerant.Addinggasrefrigerantmaychangethecomposi
-
tionoftherefrigerantinthesystemandaffectnormaloperationoftheair
conditioner.Also,chargethesystemslowly,otherwisethecompressor
will be locked.
Tomaintainthehighpressureofthegascylinder,warmthegascylinder
with warm water (under 40°C) during cold season. But never use naked
reorsteam.
Union
Stop valve
Liquid pipe
Union
Union
Union
Indoor
unit
Stop valve with
service port
Gas pipe
Refrigerant gas
cylinder
operating valve
(for R410A)
Gauge manifold
valve (for R410A)
Charge hose (for R410A)
Refrigerantgascylinder
for R410A with siphon
Electronic scale for
refrigerant charging
Refrigerant (liquid)
Outdoor
unit
1) Remove service port cap of stop valve on the side of the outdoor unit
gas pipe. (The stop valve will not work in its initial state fresh out of
thefactory,totallyclosedwithcapon.)
2) Connect gauge manifold valve and vacuum pump to service port of
stop valve on the gas pipe side of the outdoor unit.
3) Run the vacuum pump. (Vacuumize for more than 15 minutes.)
4) Check the vacuum with gauge manifold valve, then close gauge
manifold valve, and stop the vacuum pump.
5) Leave as it is for one or two minutes. Make sure pointer gauge mani
-
foldvalveremainsinthesameposition.Conrmthatpressuregauge
shows –0.101 MPa [Gauge] (–760 mmHg).
6)Remove gauge manifold valve quickly from service port of stop
valve.
7)After refrigerant pipes are connected and evacuated, fully open all
stop valves on both sides of gas pipe and liquid pipe. Operating with
-
outfullyopeninglowerstheperformanceandthiscausestrouble.
8)Refer to 1-3., and charge the prescribed amount of refrigerant if
needed.Besure tochargeslowly withliquidrefrigerant. Otherwise,
compositionoftherefrigerantinthesystemmaybechangedandaf
-
fect performance of the air conditioner.
9)Tightencapofserviceporttoobtaintheinitialstatus.
10) Leak test
Service port cap
(Torque 13.7 to
17.7 N•m, 140 to
180kgf
•cm)
Charge hose
(for R410A)
*
*Dunitisfor4B71VAonly.
WARNING
When installing the unit, securely
connect the refrigerant pipes before
starting the compressor.
MXZ-3B_4BVA-A1 JG79A319H01.indd 6 2009/10/13 10:27:03
Page view 5
1 2 3 4 5 6 7 8

Comments to this Manuals

No comments