Mitsubishi Electric MSZ-HJ35VA-E1 Service Manual Page 43

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 42
OPERATING PROCEDURE PHOTOS
2. Removing the inverter assembly, inverter P.C.
board
(1) Remove the cabinet and the panels. (Refer to 1.)
(2) Disconnect the lead wire to the reactor and the follow-
ing connectors:
<Inverter P.C. board>
CN721 (R.V. coil)
CN771 (Fan motor)
CN641 (Defrost thermistor and discharge temperature
thermistor)
CN724 (LEV)
(3) Remove the compressor connector (CN61).
(4) Remove the screws fixing the heat sink support and
the separator.
(5) Remove the inverter assembly.
(6) Remove the screw of the earth wire and the screw of
the terminal block support.
(7) Remove the screw of the terminal block and remove
the terminal block.
(8) Remove the heat sink support from the P.C. board
support.
(9) Unhook the catch of the inverter P.C. board and
remove the inverter P.C. board from the P.C. board
support.
3. Removing the R.V. coil
(1) Remove the cabinet and the panels. (Refer to 1.)
(2) Disconnect the following connectors:
<Inverter P.C. board>
CN721 (R.V. coil)
(3) Remove the R.V. coil.
43
Photo 4
Photo 5 (Inverter assembly)
Heat sink
P.C. board
support
Screws of the terminal
block support and the
back panel
Screw of the
heat sink and the
separator
Inverter
P.C. board
Screw of the
earth wire
Heat sink
support
Screw of the
terminal block support
Terminal block
support
OBH648A
Page view 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48

Comments to this Manuals

No comments