Mitsubishi Electric PUHZ-HA2 Installation Manual

Browse online or download Installation Manual for Split-system air conditioners Mitsubishi Electric PUHZ-HA2. Mitsubishi Electric PUHZ-HA2 Installation manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
English
INSTALLATION MANUAL
For safe and correct use, read this manual and the indoor unit installation manual thoroughly before installing
the air-conditioner unit.
Air-Conditioners
PUHZ-RP
·HA2
FOR INSTALLER
Page view 0
1 2 3 4 5 6 ... 11 12

Summary of Contents

Page 1 - Air-Conditioners

EnglishINSTALLATION MANUALFor safe and correct use, read this manual and the indoor unit installation manual thoroughly before installingthe air-condi

Page 2 - 1. Safety precautions

1010.System control (Fig. 10-1)* Set the refrigerant address using the DIP switch of the outdoor unit.1 Wiring from the Remote ControlThis wire is con

Page 3 - 2. Installation location

150 (250)150 (250)1000 (1500)300 (500)Max. 500100 (200)200 (300)100 (200)100 (150)200 (300)1000Max. 500500 (1000)100 (150)500 (1000)200 (300)1000 (150

Page 4

Please be sure to put the contact address/telephone number onthis manual before handing it to the customer.• Low Voltage Directive 73/23/ EEC• Electro

Page 5 - Fig. 4-2

21.2. Before installation (relocation) Caution:• Be extremely careful when transporting the units. Two or more persons areneeded to handle the unit, a

Page 6

32. Installation location1. Safety precautions1.3. Before electric work Caution:• Be sure to install circuit breakers. If not installed, electric shoc

Page 7 - 5. Drainage piping work

4B2. Installation locationB2.4. Ventilation and service space2.4.1. Windy location installationWhen installing the outdoor unit on a rooftop or other

Page 8 - 6. Electrical work

54. Installing the refrigerant pipingA Flare cutting dimensionsB Flare nut tightening torque90° ±0.5°øAR0.4~R0.8A45°±2°BCDCopper pipe O.D.A (mm)(mm)Fl

Page 9 - 7. Test run

64. Installing the refrigerant piping4.3. Refrigerant piping (Fig. 4-3) For RP35, 50Remove the service panel D (one screw). For RP60-140Remove the s

Page 10 - 9. Special Functions

74.7. Precautions when reusing existing R22 refrigerant pipes• Refer to the flowchart below to determine if the existing pipes can be used and if it i

Page 11 - Max. 500

8ABCDE6. Electrical workFig. 6-1Fig. 6-2 RP60-140 RP35, 50VA Earth terminalB Terminal blockC ClampD Service panelE Wire the cables so that they do n

Page 12 - BG79U791H01

97.1. Before test runs After completing installation and the wiring and piping of the indoor and outdoorunits, check for refrigerant leakage, loosenes

Comments to this Manuals

No comments